What is your delivery time normally?
Apr 28, 2021|View:915|
The production time is around 30 days after the deposit confirmed for the laminate floor.
For the SPC floor, it is about 25 days.
The production time is around 30 days after the deposit confirmed for the laminate floor.
For the SPC floor, it is about 25 days.